Your Cart

Your cart is empty

Home  >  Volume 26 (March 2014)

45. Weibull Reliability Assessment of a Piling Machine used in an Asbestos Production Line in Nigeria by R.O. Edokpia1 and L. Odiete. Volume26, (March, 2014), pp330 – 337.
Sale price: $5.00
Quantity:

Abstract

This study analyses the reliability of manufacturing equipment utilised in a company in Nigeria. The methodology consists of obtaining failure data of the piling machine made of thirteen main components from the maintenance department of the company for a period of one year (January to December 2011). Parameters were determined using the two-parameter Weibull Distribution. From the data, the reliability of the Piling Machine was evaluated to be 0.5557. The value is low and therefore recommendations are suggested on ways to improve this index of performance.

Keywords: Failure Rate, Reliability, Weibull Distribution, Time to Failure, Time to Repair

Close
Loading...